SECI News

The Latest at Stephens Environmental

Stormwater Facility As-built

SECI provides a full range of surveying services including construction stake-out, interim and final as-built surveys. Here Mr. Stephens is performing an interim as-built survey of a one submerged gravel wetland riser structure as the SGW filtration cells are being constructed. SECI designed the SGW stormwater stockpile and recycling yard for stormwater quality management.

Bill Stephens, surveying

  • Article Date: 2020-03-27 16:59:23
  • Category: Projects
  • Posted by: Website Admin